Imtech Process Ltd employed the services of Formatank to reline four large HDPE odour control scrubbers in 2014 at Swansea Bay.

  • Three weeks
  • Swansea, Wales
  • Water Industry
  • Relining four 2.5m diameter x 11m high HDPE scrubber tanks
  • £30,000
  • Tank life expectancy increased by Ten years
  • Saved the cost of brand-new tanks: £1M

Read in full

Water Tanks in Gibraltar

Formatank Ltd rapidly made their way to HM Naval Dockyard in Gibraltar, to refurbish two 6.5M3 hydrophore tanks which provide fresh water to the 300-strong crew on board a pipe lay and heavy lift vessel.

  • Three days
  • HM Naval dockyard in Gibraltar
  • Petrochemical
  • Two small tanks (less than 2M diameter x 3M high) holding the drinking water for ships complement of 300 staff
  • £18,000
  • Tank life expectancy increased by Five years
  • Saved the cost of brand-new tanks: £100,000

Read in full

ExxonMobil

A publicly traded international oil and gas company employed the services of Formatank to conduct external repairs to three GRP Sewage Tanks on one of the largest Ethylene Plants in Europe, situated in Fife, Scotland.

  • One week
  • Fife, Scotland
  • Petrochemical
  • Three sewage tanks, need running repairs due to damage through the years
  • £15,000
  • Tank life expectancy increased by Five years
  • Saved the cost of brand-new tanks: £90,000

Read in full

Cruachan Power Station

Formatank Ltd was called upon by Scottish Power to repair one existing moulded GRP tank, measuring 11x2x3M, which was a leaking fire sprinkler. This job was located at their Cruachan Power Station, hidden one mile beneath the serene Scottish Mountain, Ben Cruachan.

  • One week
  • Oban, Scotland
  • Water Industry
  • One existing moulded GRP tank measuring 11x2x3M
  • £14,000
  • Tank life expectancy increased by Ten years
  • Saved the cost of brand-new tanks: £90,000

Read in full

Aspatria

Formatank Ltd delivered huge savings through the refurbishment of two 20-year-old steel storage tanks, measuring 7.5 x 7.5 x 4M at First Milk’s Aspatria Facility in the Lake District, Cumbria. This job took three weeks on site.

  • Three weeks
  • Lake District, England
  • Food/Beverage Industry
  • Two existing steel tanks each measuring 7.5x7.5x4M
  • £30,000
  • Tank life expectancy increased by Ten years
  • Saved the cost of brand-new tanks: £200,000